NLC INDIA LIMITED - CORPORATE PROFILE

(Last updated on )
 

 

For more than six glorious decades, NLC India Limited has been a forerunner amongst the Public Sector Enterprises in the country in the energy sector, contributing to a lion's share in lignite production and significant share in thermal and renewable energy generation.

The Company was incorporated on 14.11.1956. NLCIL is a Navratna Government of India Enterprise, under the administrative control of Ministry of Coal. Today, the company has set its footprints in PAN India mode in the states of Assam, TamilNadu, Rajasthan, Uttar Pradesh, Odisha, Jharkhand, Gujarat and Andaman & Nicobar Islands.

A pioneer among the Public Sector Undertakings in energy sector, NLCIL operates 3 opencast Lignite Mines of total installed capacity 28 Million Tonnes Per Annum (MTPA) at Neyveli, one opencast Lignite Mine at Barsingsar in Rajasthan with an installed capacity of 2.10 MTPA and an open cast coal mine at Talabira in Odisha with an installed capacity of 20 MTPA.

The Company is also operating 4 Lignite based pit-head Thermal Power Stations with an aggregate capacity of 3390 Mega Watt (MW) at Neyveli and one 250 MW Lignite based Thermal Power Station (BTPS) at Barsingsar, Rajasthan. A 1000 MW Coal based Thermal Power Station is also in operation at Thoothukudi, Tamil Nadu through its subsidiary company, NLC Tamilnadu Power Limited (NTPL), a Joint Venture between NLCIL and TANGEDCO (equity participation in the ratio of 89:11).

Further, NLCIL formed JV with the Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) in setting up 3x660 MW Coal based Thermal Power Station at Ghatampur in UP and achieved Unit#1 COD on 12.12.2024.

NLCIL has also forayed into renewable energy sector. Presently, the Company is operating 1380 MW of Solar Power Plants in various Districts of Tamilnadu and Andaman & Nicobar Islands and 51 MW Wind Power Plant in Tirunelveli district of Tamilnadu. NLCIL is the first CPSE to cross 1 GW capacity in Solar Power Generation in the country. Now the Company has become a member of International Solar Alliance (ISA). NLCIL is aiming to achieve a total Renewable energy capacity of 10,110MW by 2030.

NLCIL has big dreams to become a 20,130 MW power generation (including Thermal & RE) company by 2030

NLCIL has entered into coal mine projects and has been allotted Talabira-II & III OCP of 20 MTPA capacity in Odisha and Pachwara South Coal Block of 9 MTPA capacity in Jharkhand. Further, NLCIL won the North Dhadu (Western Part) of 3 MTPA Capacity Coal block in Jharkhand, Machhakata (Revised) Coal Block of peak rated capacity of 30 MTPA and New Patrapara South Coal block of 12 MTPA in Angul District of Odisha State in Commercial Coal block auctioning.

Coal production in Talabira-II & III OCP (20 MTPA) was commenced on 26.04.2020 & COD attained on 01.04.2021. The Mine started to supply coal to its end use Plant, NTPL TPS, Thoothukudi and now supplies coal to NTPC Thermal Power Stations.

Project activities are in full swing at Pachwara South Coal Block (9 MTPA) with an anticipated commencement of Mines by 2024-25.

A coal-based pit-head Thermal Power Project of capacity 3200 MW at Talabira, Odisha is under construction. Land Acquisition is in process.

Further, a JV Company, 'Coal Lignite Urja Vikas Private Limited' (CLUVPL) was incorporated on 10.11.2020 with Coal India Limited (equity participation in the ratio of 50:50). In addition, NLCIL plans to install number of Solar/Wind Power Projects at various parts of the Country.

Wholly Owned Subsidiary Company, "NLC India Renewables Limited" has been incorporated on 14.06.2023 to take over existing renewable assets of NLCIL.

On 13th October 2023, "NLC India Green Energy Limited" (NIGEL), a wholly owned subsidiary of NLCIL was incorporated to undertake future renewable energy projects of NLCI
Not just Mining and Power Generation, NLCIL has contributed significantly to the Socio-Economic development of the Nation for more than six decades.